Country |
Mali |
Client |
Regional Assembly of Kidal |
Overall project value (EUR) |
€ 1 428 000 |
Origin of funding |
ANICT (KFW – Ministry of Foreign Affairs Luxembourg) |
Proportion carried out by legal entity |
95% |
Consortium members |
HRDI |
Start date |
April 2010 |
End date |
August 2017 |
Number of staff provided |
23 w/d |
Detailed description of project Back
The proposed realization of pastoral water works covers mainly the area of the Tilemsi valley, covering the municipalities of Tessalit Aguelhok, Timtaghène, Essouk and Anefif (the region of Kidal). This is a livestock area par excellence. Periodically, transhumances from the regions of Gao and Timbuktu and from South Algeria come to seek pasture for their herds of camels and goats, especially during the cold, winter season.
The project consists of:
The geographical distribution of boreholes is determined by patterns of pastoral developments made by the Regional Assembly of Kidal and based on the mapping of water points and pasture needs expressed by local authorities in June 2009. Settlements will however remain dependent on feasibility constraints determined by preliminary geological and geophysical studies.
The expected results are:
The Local Authorities are the beneficiaries of the program. The Regional Assembly of Kidal will be in charge of transferring the water points to the local authorities who, after training, will be responsible for setting up management committees for their maintenance and servicing.
PROMAN in partnership with HRDI, acting on behalf of the Ministry of Foreign Affairs of the Grand Duchy of Luxembourg, was appointed by the Regional Assembly of Kidal as Client’s Representative and project manager for this project.
The support provided includes studies, contracting and supervision of works, provision of technical and logistical facilities (operational base and skilled personnel experienced in the region), accompanying measures for the management of water points by beneficiary communities.
Main staff provided: